<?xml version="1.0" encoding="UTF-8"?>
<!--Generated by Squarespace Site Server v5.11.81 (http://www.squarespace.com/) on Mon, 28 May 2012 23:53:18 GMT--><?xml-stylesheet type="text/css" href="/universal/styles/feed.css"?><rss version="2.0"><channel><title>Building Commissioning blog - Comments</title><link>http://www.virtualcx.com/blog/</link><description></description><copyright></copyright><language>en-US</language><generator>Squarespace Site Server v5.11.81 (http://www.squarespace.com/)</generator><item><title>Energy Efficient Lighgting comments on Survey In Today's Facility Manager Shows Lighting Upgrades To Continue</title><author>Energy Efficient Lighgting</author><pubDate>Tue, 08 May 2012 12:00:14 +0000</pubDate><link>http://www.virtualcx.com/blog/2010/7/30/survey-in-todays-facility-manager-shows-lighting-upgrades-to.html#comments</link><guid isPermaLink="false">517098:5930101:comment/18044527</guid><description><![CDATA[<p>We should have a better understanding of the current market conditions for the lighting industry and why efficient lighting is so important to cutting costs and saving energy.</p><p><br/>&lt;p&gt;<a href="http://www.energyefficient-lighting.com/" rel="nofollow">Energy Efficient Lighting</a>&lt;/p&gt;</p>]]></description></item><item><title>solar panels comments on 6 Easy Tips for Completing Commissioning on Schedule</title><author>solar panels</author><pubDate>Sat, 07 Apr 2012 02:22:51 +0000</pubDate><link>http://www.virtualcx.com/blog/2011/6/24/6-easy-tips-for-completing-commissioning-on-schedule.html#comments</link><guid isPermaLink="false">517098:5930101:comment/17558812</guid><description><![CDATA[<p>Thanks for posting. These seems like easy tips, but a lot of people might not know.</p>]]></description></item><item><title>Nick A comments on 6 Easy Tips for Completing Commissioning on Schedule</title><author>Nick A</author><pubDate>Mon, 12 Mar 2012 17:22:34 +0000</pubDate><link>http://www.virtualcx.com/blog/2011/6/24/6-easy-tips-for-completing-commissioning-on-schedule.html#comments</link><guid isPermaLink="false">517098:5930101:comment/17290534</guid><description><![CDATA[<p>These are some great suggestions to keep in mind when managing a Cx project. As a Cx provider, I feel that tip #6 end up happening more often than not.</p>]]></description></item><item><title>Building Automation Controls Training comments on 6 Easy Tips for Completing Commissioning on Schedule</title><author>Building Automation Controls Training</author><pubDate>Mon, 16 Jan 2012 22:38:11 +0000</pubDate><link>http://www.virtualcx.com/blog/2011/6/24/6-easy-tips-for-completing-commissioning-on-schedule.html#comments</link><guid isPermaLink="false">517098:5930101:comment/16602317</guid><description><![CDATA[<p>I can&#39;t agree more with all of the above points and I am coming from the point of a BMS Controls Contractor. Though in my personal experience I am always the one saying, &quot;Hey guys if you want to make this date you have to get us power more than the day before.&quot;</p><p>Even with installation and programming being completed before power is available, there still is a good few days if not a week or so depending on the size of the job, where we need to do out point to point checkouts, calibrations and verification of SOO.</p><p>Great post... I will keep my eye on more information to apply to my Blog on <a href="http://www.thecontrolsfreak.com" title="HVAC Controls and Building Automation" rel="nofollow">HVAC Controls and Building Automation</a>.</p>]]></description></item><item><title>Steve Walter comments on Development of a Knowledge-Based System to Improve Mechanical, Electrical, and Plumbing Coordination</title><author>Steve Walter</author><pubDate>Fri, 21 Oct 2011 12:01:56 +0000</pubDate><link>http://www.virtualcx.com/blog/2011/2/23/development-of-a-knowledge-based-system-to-improve-mechanica.html#comments</link><guid isPermaLink="false">517098:5930101:comment/15424786</guid><description><![CDATA[<p>Really nice article. I love reading this very informative and resourceful post about plumbing. :)</p>]]></description></item><item><title>Deatrix Muntz comments on Commissioning Daikin VRV systems</title><author>Deatrix Muntz</author><pubDate>Tue, 23 Aug 2011 19:35:02 +0000</pubDate><link>http://www.virtualcx.com/blog/2010/5/12/commissioning-daikin-vrv-systems.html#comments</link><guid isPermaLink="false">517098:5930101:comment/14872433</guid><description><![CDATA[<p>What a pile of chuff, basic and short. Pretty picture and well written but seriously who cares about 2000 step electronic expansion valves. X</p>]]></description></item><item><title>Air Duct Cleaning 33498 comments on The Certified Building Commissioning Firm (CBCF) Certification Program - NEW from AEE</title><author>Air Duct Cleaning 33498</author><pubDate>Tue, 23 Aug 2011 11:42:04 +0000</pubDate><link>http://www.virtualcx.com/blog/2011/3/16/the-certified-building-commissioning-firm-cbcf-certification.html#comments</link><guid isPermaLink="false">517098:5930101:comment/14870029</guid><description><![CDATA[<p>It is very informative blog about to improve the practice of building commissioning by encouraging professionals in a firm to engage in a continuing education program or professional development related program, i hope this blog is helpful for my <a href="http://bocaraton.air-ductcleaning.net/" rel="nofollow">Air Duct Cleaning 33498</a> business.</p>]]></description></item></channel></rss>
