Below, we've listed some examples of what we need from you before we begin work.
Of course, to start with you will need to give us your project name and location, as well as your company logo and contact information.
Once you've placed your order, we will firm up the list of things we need to get started. After you've given us everything, we usually only need one to three weeks to finish.
COMMISSIONING PLAN
- Date the Cx Plan is needed
- General scope of Cx work (HVAC, lighting controls, domestic hot water, etc.)
- Other scope details (how many reviews, how many on-site meetings, etc.)
- List of commissioned equipment
- Percentage of Cx sampling for various tasks (HVAC, lighting, TAB, etc.)
- Rough construction schedule
- Commissioning team contact information (we will send you the form)
COMMISSIONING TEST PROCEDURES
- Date the Test Procedures are needed
- PDF of applicable specification sections
- PDF of BMS controls submittals
- PDF of approved sequences of operation
- PDF of equipment schedules
- If sampling, we can pick the samples or you can
COMMISSIONING FINAL REPORT
- Date the Final Report is needed
- Filled out Executive Summary (we provide a template)
- Filled out Lessons Learned (we provide the survey)
- Executed test procedures
- Complete Issues Log
- Commissioning meeting agendas/minutes
- Cx design and submittal reviews
- TAB draft or final report
- BMS as-builts, including as-built sequences
- Owner's Project Requirements (LEED only)
- Basis of Design (LEED only)
- Other optional material
COMMISSIONING SYSTEMS MANUAL (FOR LEED)
- Date the Systems Manual is needed
- Owner's Project Requirements (OPR)
- Basis of Design (BOD)
- BMS as-builts, including as-built sequences & 1-lines
- Lighting control operating parameters, with a 1-line
- Domestic hot water systems operating parameters, with a 1-line
- Operational parameters of other systems
- PDF of O&M submittals (we can also perform your LEED O&M submittal review)
- PDF copies of warranties
- Blank test procedures for re-commissioning (we provide these)